Be careful on descent from 183 on to Sandy Brook Rd.

Looks like they are going to mill and resurface section of Sandy Brook Rd from just above the highway dept garage up to 183. There is a cut in the asphalt across the road about 100 yards beyond the highway dept heading toward 183. There is a 3" drop off going up to 183...not a big deal. But the three inch lip coming the other way downhill off 183 would be a bad surprise coming down the hill at full speed. It's just going into the left hand curve before the road levels off at the highway dept garage.

Ouch thanks for heads up.

The work is complete.